assets/example_time_block_plan.md
3.9 KB查看源码Worked Example — A Full Deep-Work Day (Audit → Plan → Mid-Day Revision → Shutdown)#
A complete pass through the
deep-workskill for one realistic day, showing the exact script invocations and their outputs, including the mid-day revision that every real day eventually needs.
The raw task list (as the user gave it)#
- Write the Q3 product spec — ~2h, the week's most important output
- Design the onboarding flow — ~1.5h
- Email sweep — 30 min
- Team status update — 20 min
- Expense report — 15 min
Day: 08:30 hard start, 17:00 hard stop, lunch 12:30.
Step 1 — Shallow audit#
python scripts/shallow_work_auditor.py \
--task "Write Q3 product spec:120" \
--task "Design onboarding flow:90" \
--task "Email sweep:30" \
--task "Team status update:20" \
--task "Expense report:15" \
--budget 50
Result: Write Q3 product spec and Design onboarding flow classify DEEP (write/design signals);
the other three classify SHALLOW (email/status/expense signals). Shallow share = 65 of 275 min =
23.6% vs a 50% budget → WITHIN-BUDGET (exit 0). The forcing question printed for each shallow
item confirmed none of them deserves a promotion to deep. Proceed.
Step 2 — The plan#
python scripts/time_block_planner.py --start 08:30 --end 17:00 --lunch 12:30 \
--task "Write Q3 product spec:120:deep" \
--task "Design onboarding flow:90:deep" \
--task "Email sweep:30:shallow" \
--task "Team status update:20:shallow" \
--task "Expense report:15:shallow"
| Start | End | Block | Mode |
|---|---|---|---|
| 08:30 | 10:30 | DEEP — Write Q3 product spec | DEEP |
| 10:30 | 10:40 | Buffer — stand up, reset | BUFFER |
| 10:40 | 12:10 | DEEP — Design onboarding flow | DEEP |
| 12:10 | 12:20 | Buffer — stand up, reset | BUFFER |
| 12:20 | 12:30 | Flex — reset, no inputs | FLEX |
| 12:30 | 13:00 | Lunch — away from the desk | BREAK |
| 13:00 | 13:50 | SHALLOW batch (late morning) — Email sweep · Team status update | SHALLOW |
| 13:50 | 16:45 | Flex — overflow absorber | FLEX |
| 16:45 | 17:00 | SHALLOW batch (end of day) — Expense report | SHALLOW |
Deep 3h30 / 4h cap · Shallow 1h05 · Flex 3h05 · Buffers 20min
Reading the plan: both deep blocks own the morning — the best hours — before the manager-schedule world wakes up. Shallow work exists in exactly two windows. The big afternoon flex block is not waste; it is where meetings, overruns, and surprises land without touching the deep blocks.
The revision (because the day broke, as days do)#
At 10:15 an incident call ate the rest of the spec block. The rule: revise, don't abandon. At 11:00, re-plan the remaining day with what actually survives:
python scripts/time_block_planner.py --start 11:00 --end 17:00 --lunch 12:30 \
--task "Finish Q3 product spec:90:deep" \
--task "Email sweep:30:shallow" \
--task "Team status update:20:shallow" \
--task "Expense report:15:shallow"
The onboarding-flow design moved to tomorrow's first block — named and deferred, not silently squeezed into the evening. The redrawn day still has one protected 90-minute deep block, and the hard stop did not move.
Step 3 — Log what actually happened#
python scripts/focus_session_logger.py log --minutes 75 --label "Q3 product spec (pre-incident)"
python scripts/focus_session_logger.py log --minutes 90 --label "Q3 product spec (finish)"
python scripts/focus_session_logger.py status --target 15
2h45 banked today. The week's ledger, not memory, decides whether the 15-hour target is on track.
Step 4 — Shutdown#
Run assets/shutdown_checklist.md: the deferred design block is already on tomorrow's plan, the
incident follow-up is captured as a task, tomorrow's first block is confirmed. "Shutdown
complete." No work thoughts after the phrase.
文件内容是平台检查时读出的文本,只供查看。平台不会运行包里的任何脚本或程序。